Behind the Scenes Work Continues for Our Lift Project

While not immediately visible here at church, work continues at a quickening pace on our lift replacement project!

101 Mobility of Coralville has received final drawings from the lift manufacturer (Savaria Lifts) and visited church on Wednesday, October 21 to confirm several drawing details. Lift raw materials have been ordered by 101 and are currently in production. 101’s engineering manager will do a site visit within the next couple weeks and then, with solid ship dates for the lift components, be prepared to schedule the on-site installation.

Please recall that you can help support this project by considering a contribution, which will be used to replace the funding for future accessibility projects. Donations of ANY size are appreciated. If contributing, please indicate “Lift Replacement Project” on the memo line of your check or in a note attached to any cash donation. Thank you for your generosity!

Previous
Previous

Break Bread, Build Bridges: Gathering Together After Midterm Elections

Next
Next

Want to Thank the Clean Team?